Tel:
|
966 12 684 8046
966 12 684 8959
|
|
|
Fax:
|
966 12 640 5622
|
|
|
AFS
|
OEJDYKYX
|
|
|
http://www.sans.com.sa
|
|
|
E-mail:
|
aim@sans.com.sa
|
|
|
|
|
|
|
|
KINGDOM OF SAUDI ARABIA
GENERAL AUTHORITY OF CIVIL AVIATION
SAUDI AIR NAVIGATION SERVICES
AERONAUTICAL INFORMATION MANAGEMENT
P. O. BOX 929, JEDDAH - 21421
|
|
|
|
|
|
AIP
SUP
AIP SUP 01/25
03 JAN 2025
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OEJN — JEDDAH / KING ABDULAZIZ INTL AIRPORT
|
Replacing South Jetway and Introducing temporary new aircraft stand Project
|
|
The purpose of this AIP Supplement is to notify aircraft operators regarding the new project of replacing the current south jetway on Apron 8 and introducing a new aircraft stand (Stand: R4) on Apron 8 at
King Abdulaziz Intl Airport (KAIA).
|
2 .Timeframe for the installation activities:
|
The period of the installation activities of the replacing the current south jetway on Apron 8 and introducing a new aircraft stand (Name: R4) on Apron 8. These activities are divided as follows:
Project
Phases
|
Activity
|
Duration
|
Consequence
|
Remark
|
Phase 1
|
Installation new
marking for the
temporary parking
stand R4
|
+ 1 week |
- Stand R1 and R2 will be closed throughout the
project duration via a NOTAM.
- Docking to stand R4 will be via follow me, and
suspension of stand 8-06, 8-07, and 8-08 from
operations.
|
All phases
would be
announced by
NOTAM.
|
Phase 2
|
Civil Work and removal
of current jetway
|
+ 2 weeks |
Phase 3
|
Civil Work for
preparation for the
installation of the new
jetway
|
+ 2 weeks |
Phase 4
|
Civil Work for
installation of the new
jetway
|
+ 2 weeks |
Phase 5
|
Test commissioning |
+ 1 week |
|
3 .Areas affected during the work in progress:
|
Working Area
|
Points
|
Coordinates
|
Height above ground
level
|
Elevation above
mean sea level
|
Equipment
|
1
|
21°40'20.87"N
39° 8'06.51"E
|
20m |
29m |
Crane within the fence
area
|
2
|
21°40'22.81"N
39° 8'05.77"E
|
20m |
29m |
Crane within the fence
area
|
3
|
21°40'23.52"N
39° 8'05.61"E
|
20m |
29m |
Crane within the fence
area
|
4
|
21°40'24.89"N
39° 8'04.92"E
|
20m |
29m |
Crane within the fence
area
|
The attached illustration shows the areas affected during work in progress
|
4 .Activation of the AIP supplement:
|
Trigger NOTAM will be issued in accordance with AIRAC procedure.
|
5 .Replacement or cancellation of the AIP SUP:
|
Any significant change in the current information would be notified by replacement AIP.
This AIP Supplement will remain effective until further notice, and NOTAM will be issued to announce the cancellation of this AIP SUP.
|
|
For any inquiries, please contact:
Aerodrome / SANS
|
CONTACT DETAILS
|
Jeddah TWR
|
Name: JED Tower
Email: jedtwr@sans.com.sa
|
Aerodrome Operator (JEDCO)
|
Name: Adil Abdo
Email: aabdo@jeddahairports.sa
|
Aerodrome Operator (JEDCO)
|
Name: Moataz Faraj
Email: mafaraj@jeddahairports.sa
|
- END -
|
OE-eSUP-2025-01-en- chart JED SA
|