KINGDOM OF SAUDI ARABIA
GENERAL AUTHORITY OF CIVIL AVIATION
SAUDI AIR NAVIGATION SERVICES
AERONAUTICAL INFORMATION MANAGEMENT
P. O. BOX 929, JEDDAH - 21421

     
  AIP
SUP

AIP SUP 01/25
03 JAN 2025
 
     
   

                                              OEJN — JEDDAH / KING ABDULAZIZ INTL AIRPORT

                             Replacing South Jetway and Introducing temporary new aircraft stand Project

1 . Introduction:

The purpose of this AIP Supplement is to notify aircraft operators regarding the new project of replacing the current south jetway on Apron 8 and introducing a new aircraft stand (Stand: R4) on Apron 8 at King Abdulaziz Intl Airport (KAIA).

2 .Timeframe for the installation activities:

The period of the installation activities of the replacing the current south jetway on Apron 8 and introducing a new aircraft stand (Name: R4) on Apron 8. These activities are divided as follows:
 
Project
Phases
Activity Duration Consequence Remark
Phase 1 Installation new
marking for the
temporary parking
stand R4
+ 1 week

- Stand R1 and R2 will be closed throughout the
project duration via a NOTAM.


- Docking to stand R4 will be via follow me, and
suspension of stand 8-06, 8-07, and 8-08 from
operations.
All phases
would be
announced by
NOTAM.
Phase 2 Civil Work and removal
of current jetway
+ 2 weeks
Phase 3 Civil Work for
preparation for the
installation of the new
jetway
+ 2 weeks
Phase 4 Civil Work for
installation of the new
jetway
+ 2 weeks
Phase 5 Test commissioning + 1 week

3 .Areas affected during the work in progress:

Working Area
Points Coordinates Height above ground
level
Elevation above
mean sea level
Equipment
1 21°40'20.87"N
39° 8'06.51"E
20m 29m Crane within the fence
area
2 21°40'22.81"N
39° 8'05.77"E
20m 29m Crane within the fence
area
3 21°40'23.52"N
39° 8'05.61"E
20m 29m Crane within the fence
area
4 21°40'24.89"N
39° 8'04.92"E
20m 29m Crane within the fence
area


The attached illustration shows the areas affected during work in progress

4 .Activation of the AIP supplement:

Trigger NOTAM will be issued in accordance with AIRAC procedure.

5 .Replacement or cancellation of the AIP SUP:

Any significant change in the current information would be notified by replacement AIP.

This AIP Supplement will remain effective until further notice, and NOTAM will be issued to announce the cancellation of this AIP SUP.

6 .Inquiries:

For any inquiries, please contact:
 
Aerodrome / SANS CONTACT DETAILS
Jeddah TWR Name: JED Tower
Email: jedtwr@sans.com.sa
Aerodrome Operator (JEDCO) Name: Adil Abdo
Email: aabdo@jeddahairports.sa
Aerodrome Operator (JEDCO) Name: Moataz Faraj
Email: mafaraj@jeddahairports.sa

 

- END -